Wednesday, October 17, 2007

Auxiliary Power Units

There hasn't been a whole lot of exciting stuff going on. Mostly just writing closures and putting run books together for the launch next week. So here we are, 6 posts deep and it's evident what department I work in but it was never really explained what the system does. So here you go...

The auxiliary power unit (APU) is a hydrazine fueled, turbine driven power unit which produces mechanical shaft power to a hydraulic pump which produces pressure for the orbiter's hydraulic system. There are three APUs on the orbiter. Located in the aft compartment of the orbiter, APUs 1 and 2 are located on the left side and APU 3 is on the right. The three systems are identical but independent.

Each fuel system supplies stored liquid hydrazine to the fuel pump, gas generator valve module, and gas generator. The fuel decomposes extremely rapidly in a catalytic action. The resulting gas is used to drive a two-stage turbine. The gas returns over the the gas chamber to cool it down and then exits through exhaust ports on the top of that aft of the orbiter.

The lube oil of each APU is circulated through a heat exchanger in a respective water spray boiler which cool the lube oil systems. The hydraulic fluid sees the same process to cool it as well.

The APU system is started 5 minutes before launch and remains online through the launch and until the first orbital maneuvering system (OMS) thrusting period where they are shut down until the orbiter is ready to make a return to Earth. During launch the hydraulic fluid powered by the APU applies pressure to actuators for thrust vectoring by gimbaling of the three main engines, supplies load relief to the elevons during the ascent phase, and retracts the fuel and oxidizer umbilicals from the external tank when it is ready to be jettisoned.

About a day before deorbit, one APU is restarted to support checkout of the flight controls which include the elevons, rudder, speed brake, and body flap. The other two APUs are restarted after the deorbit and function through entry, landing, and landing rollout for hydraulic pressure for positioning of the aerosurfaces during atmospheric flight, deployment of the landing gear, brakes, anti-skid, nose wheel steering, and positioning of the three main engines.

The fuel tanks hold about 325 pounds of hydrazine which is enough for the 90 minutes per mission the APUs would normally operate with reserve in the event of an abort once around when the APUs would be active for 120 minutes. They consume about 3 pounds of fuel per hour.





Technical data collected from: http://science.ksc.nasa.gov/shuttle/technology/sts-newsref/sts-apu.html

Pictures from: http://www.columbiassacrifice.com/&0_shttlovrvw.htm

Saturday, October 13, 2007

The Confidence Run

On Wednesday with did OV103's (Discovery) confidence run. This is where we actually turn on and run the APU to make sure there won't be any issues for the launch. I went in to do the walk down in the morning to make sure that the exhaust plugs on Discovery were taken out. The job is run and monitored from the firing room and it is all a matter of pushing a few buttons. Each APU was run for about 5 minutes at regular speed and then for about 15 seconds on high speed. The exhaust from the APU is mostly ammonia. You can kind of see the vapors being ejected when the APU first starts but after a few bursts, you do not see it after about half a minute. So to monitor it there is also a thermal camera pointed at the Orbiter. And since the exhaust is about 900 degrees, you can see it pretty well on the thermal camera.

After the walk down was complete the Rotating Service Structure had to be rolled open to so that the exhaust did no pollute the platforms where the ports were. The RSS moves pretty slow so it does not damage any flight hardware but when its fully open, it is a beautiful sight.





Very rarely is the RSS open. Really the only time it is open for any extended period is a day or two before launch. So this was an occasion I wanted to be around for. I got a couple pictures in the morning before my battery died and then used my lunch break to take my good camera up and get some more, better shots.





Tuesday, October 9, 2007

Problem Reports and Closures

Going back to another post with saying that EVERYTHING gets documented, today I did my first closures on some Problem Reports. A Problem Report documents a discrepancy on a piece of equipment and steps to fix it. The closure is basically just a summary of the report and a conclusion. It states the problem, what was done to fix it, and the end result. The ones I wrote were for failed GN2 samples and a leaky valve. Simple stuff that was fixed by re-sampling the GN2 and tightening the valve. Pretty basic stuff, but you have to start somewhere.

Today was the first time I got to up my unescorted access to use. I only ran some papers to the firing room for signatures and then delivering them to the Pad. Yet another surreal moment as I sat in my car...alone...and stared at the shuttle sitting pretty on the launch pad. I love my job.

Tomorrow is a dress rehearsal for the launch. I am working on being able to sit in on the job, but I'm not sure what it entails for our group. There is going to be the confidence run on Thursday, which is what I'm really looking forward too because it will be the first time I get to see the APUs fired up. For the confidence run, the RSS has to be rolled back. Hopefully I can get some time to go out and get some good shots of the shuttle.

Monday, October 8, 2007

Hey! Two For One! Over the weekend...

This passed weekend was fuel loading for the APU and HPU. The HPU (Solid Rocket Boosters) was done on Saturday and is, from what I understand, a pretty quick job. I wouldn't know because I was not there. I only got approved for extra time for Sunday which was the APU (Orbiter) loading. Which is fine and dandy with me because on Sundays, I make double...but this job is soooo not about the money. It is a plus though. The APUs take a bit longer. It is said that it can take 12+ hours for the loading. On Sunday it took about 11 if you include the time we had to wait before we actually began flowing fuel. I only stayed for 10.

The process is fairly simple. It just takes a long time. First we have to get whatever fuel is left in the tank from the last flight out. The APUs use Hydrazine. In another post, I'll explain how it works. When all of the fuel is out we fill it back up. It is the easiest way to keep track of how much is loaded. In this case, we had to load 356 lbs. Typically is lower but in this case we had to load 26 lbs more to do a confidence run (a test run where on the ground where the APUs are fired up and operate for a given time to make sure they will be a-ok for flight). Next we pressurize the GN2 (gaseous nitrogen) bladder which applies pressure on the hydrazine to force it out since gravity is of little use in space. Once those parts are complete you have to do leave checks to make sure you won't lose anything. Then there is some clean up and then disconnection of the QDs (quick disconnects (fuel lines)).

The GN2 is fed from the facility. Another project of mine for the semester is to process a new piece of equipment which would allow us to pressurize GN2 on the go. At the moment the GN2 is still connected because we will have to re-pressurize after the confidence run. It is connected to the RSS (rotating service structure) which pivots around on the pad to allow access to the Orbiter and installation of the payload into the payload bay.

All around a good day. It started off where we might have had to put off the operation because of inclimate weather but 5 minutes before the drop dead time of 12pm it cleared up and we were good to go. There was some radio problems later on but that was the extent of the bad juju.

Saturday, October 6, 2007

The First Couple Days

I made it into the office on the third day of my orientation. I got there just in time to get introduced to the team and sit in on the morning meeting. To my surprise, I was not the only new person around. All together, the person in the group with the most experience, the team specialist, has only 3 years experience. I was, for the most part, instantly welcomed. A lot of people joked saying I should probably know how to make coffee and take some heat. That really wasn't the case. Sure I did a bit of go-for and some light work but it was kind of expected. Most of the stuff I started out with was database work. Making some spread sheests for the team to reflect some important information they needed allocated into a single place. And (with much thanks to my physics and experimental aerodynamics labs) I'm pretty good with Excel and could breeze through anything they gave me.

Now I am taking on some heavier work now that I know the system a bit more. There is a lot of stuff to know about the different types of paperwork. There is a different procedure for everything you want to do. And if you want to do something, you better have some paper that authorizes you to do it. EVERYTHING is documented and made official. Good thing they use recycled paper. Currently I am updating OMIs (Operation and Maintenance Instructions). For everything that gets processed on the Orbiter, there is instructions on how to do it. That's what these are. When the group runs the book, they often find things that are wrong, or should be updated to make the operation run more effectively. So in order to make a change to the book, you have to write a Deviation (Dev.). When you get so many deviations things can get messy. So every once in a while someone will sit down and incorporate these deviations and "red lines" through the book, into a new draft and so that the OMI can be sent of to OMD (Operation and Maintenance Documentation) and OMD will make their own revisions and approve the document for release and it can be used for the future. Then the process starts over again.

Orientation

I work in the Auxiliary Power Units (APU) group and we handle processing for the APUs for the three orbiters, and the HPUs (Hydraulic Power Units) which are on each of the Solid Rocket Boosters (SRBs) as well as maintaining the Ground Service Equipment (GSE).

To kick this off I started my co-op 27 Aug 2007. I met with the other co-ops and new hires at the off-site facility in Cape Canaveral before we started the processing to begin work and to get my company identification badge. The very first thing to be taken care of was ELSA (Emergency Life Support Apparatus) Training. This is a annual procedure and in my opinion, when the first thing you do on the very first day is emergency breathing apparatus training, you know you are in for something big. Next, we moved on to filling out the paperwork and setting up employee profiles and began the preliminary training on the computer systems and some general rules. From there we broke up and moved out to the work site(s). Not before picking up yet another ID badge, this one for Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS).

I had specific direction to follow as there were only a couple gates open for entrance to Kennedy Space Center because of the strike that was going on. At this point I am driving north on State Road 3 toward the Vehicle Assembly Building (VAB) which is one of the largest buildings in the world (525 feet tall, 716 feet long, 518 feet wide, covers 8 acres, and encloses 129,428,000 cubic feet) and this thing seems to get infinitely bigger and bigger as I get closer and closer.



I had (and still have) trouble believing that any of this is happening. I have gotten passed the security gate (which was something I've wanted to do since my first trip to the Space Center when I was really young. I am staring at the infamous 209 x 110 foot American Flag along the side and what is known as the NASA 'Meatball' and I'm just in complete awe.

I make it to the security gate on site (which is just outside the VAB, by the way) to get my access badges and move on to the training building. At the training building I met up with the coordinator and because I was the only co-op for the department, I was the only one in this building to watch what could have been the most boring videos I have ever seen. Everything from Flight Hardware handling to the emergency procedures from almost EVERY FREAKIN BUILDING ON SITE. Sweet God, I do not think there was a point in my life where time was down to a crawl and I wanted to rip my hair out....I did this for the next day and a half....

By Wednesday the 29th I was deemed ready to move on to the office. My manager came to collect me and walk me over. The office I work in was at first sight, the epiiome of the corporate office world. I could't help but think of Office Space and the Terry Tate: Office Linebacker commercials



But it was pretty much anything but. The environment is really casual and the people I work with are cool and really down to Earth. They were all very welcoming and I felt at home. It probably helps that two of the people I work with also went to my school.

All-in-all, not a bad experience. So far I have been there a little over a month and there isn't a day that goes by where I dread going to work.